New Home Builder in Cumberland, ME
Working with a new home builder in Cumberland, ME starts with the septic plan: the town's growth permit application needs either an HHE-200 septic design dated within the last two years or proof of a sewer user unit. We have that design drawn from test pits on your lot first, because it fixes where the house sits and how many bedrooms it can hold.
- (207) 613-8565
- 130 Main St, 1st Floor, Ste 2, Gorham
- [email protected]

- Part of Legacy Construction, founded 2021
- 4 to 6 builds at a time, never more
- 5-year workmanship warranty, in writing
This page is about building a new custom home in Cumberland, Maine, from the Casco Bay shore at Cumberland Foreside to the open rural parcels of West Cumberland.
New Home Builder Portland designs and builds ground-up houses on the owner's land. Because the town wants a septic design or proof of a sewer hookup with every growth permit application, we answer that question first and price the house from finished drawings.
The figure to keep: turnkey construction averages $315 to $365, $365 to $435 or $435 to $490+ per square foot by finish tier, without land. A 2,400 square foot Cumberland house averages $756,000 to $876,000 simple and $1,044,000 to $1,176,000+ at high detail.
Why Does Cumberland Want the Septic Plan Up Front?
Cumberland wants the septic plan up front because a growth permit application goes nowhere without it, and an approved growth permit lapses if a building permit does not replace it within 90 days. We treat that 90-day window as the starting line, so the drawings and the price are finished before the growth permit is filed.
- An HHE-200 septic design in hand before the growth permit
- RR1 lots: 4 acres, or 2 with a sewer connection
- Foreside, Center and West Cumberland each read on their own terms

Get your free estimate request sent in 60 seconds!
Where Else Around Cumberland Do We Build New Homes?
See all 22 towns we serveWhat Do We Build for Cumberland Homeowners?
A new house in Cumberland draws on three pieces of our work: the build, a careful read of the land, and design drawn to the town's setbacks.

New Home Construction From the Center to the Foreside
New home construction in Cumberland is busy: the town issued 49 permits for new homes and other buildings in June and July 2026 alone. We hold our count to four to six active builds by design, so a Cumberland house never waits behind a long list of ours.
Code Enforcement holds every new house to the 2021 IRC and IECC under MUBEC, the energy and building code every Maine town of 4,000 or more must enforce. A new home's permit is billed by area: $0.40 for each finished square foot and $0.20 for each unfinished one.

Building on Your Own Land in Rural Cumberland
Building on land you own in rural Cumberland starts with acreage: RR1 needs 4 acres, or 2 with a sewer connection, and RR2 needs 2 acres, both with 200 feet of frontage and a 75-foot rear setback.
The HHE-200 is drawn by a site evaluator, the state-approved septic designer, from test pits that expose the soil profile, and that design caps the bedrooms a lot can carry. We have the pits read before a plan grows a fourth bedroom.

Custom Home Design Drawn to Cumberland's Setbacks
Custom home design in Cumberland's rural districts starts from the setbacks: 50 feet in front, 75 at the rear and 30 on each side, with 75 feet for the two sides combined. A house drawn before those lines are on the plan is a house that gets redrawn.
Our design work takes four to six weeks, and what comes out is one set of full construction drawings: the set the code office reviews and the set the fixed price is built from.
What New Home Building Services Do We Offer in Cumberland?
Most lots in this town call for these three services.
- Design drawn to Cumberland setbacks
- Septic design and lot work, priced first
- New homes on land you own
Cumberland's Code Enforcement office issues building permits and may ask for elevations, section drawings or floor plans plus a site plan with each one. We assemble and file that set, and the Code Enforcement Officer (CEO) alone decides on it.
How to Go From Cumberland Land to a Finished House

Test pits, a lot walk and the sewer question.
We walk the land with you, have the test pits dug and read, and check whether public sewer or Portland Water District water reaches your road.

Plans, a number, and both signatures.
When design wraps up you have every sheet of the plans and a fixed price, and under Maine law a job of more than $3,000 gets a signed contract that keeps the opening payment within a third of the price.

Built in reviewed phases, reported every week.
Joe Hausler's commercial career topped out at a $300 million development before he turned to custom homes, and he runs a Cumberland schedule with the same discipline: no crew moves on until he has checked the phase before it, an update reaches you weekly, and your final walkthrough comes before any key leaves our hands.
How Do You Pick a New Home Builder in Cumberland, ME?
The new home builder in Cumberland, ME worth hiring prices from full drawings and an HHE-200 in hand, never from a floor plan drawn before anyone dug a test pit. The septic design is the first hard limit on the house, and a price set before it is a guess.
Cumberland lots split by village. At the Foreside on Casco Bay, building within 250 feet of the water needs a Shoreland Zoning Permit, the town's share of Maine's shoreland zoning law, while the rural parcels inland carry the big acreage and frontage rules.
Then ask for the paper: one fixed price, and a contract written to 10 MRSA §1487, Maine's rule for home construction contracts. Our workmanship coverage lasts five years, in writing, and most builders offer one.

Who Reviews a Cumberland House, Where, and When?
Who reviews a shoreland permit in Cumberland?
A shoreland permit in Cumberland is reviewed by town staff for a $150 fee, or by the Planning Board for $250. The permit applies to building anywhere inside 250 feet of a lake, river or stream, or of a wetland connected to one.
Where does public water reach in Cumberland?
Public water in Cumberland comes from the Portland Water District, and the Yarmouth Water District serves a very small portion of town. Cumberland's wastewater is treated at Falmouth's Clearwater Drive plant, so whether your street carries either line is the first thing we confirm.
When does a Cumberland growth permit expire?
A Cumberland growth permit expires 90 days after approval if no building permit replaces it, and each application carries a $100 fee. That clock is why our drawings and price are done before we file.

Something else to ask? Call (207) 613-8565.
How Much Does a New Cumberland House Cost?
A new Cumberland house costs $315 to $365 per square foot in the simple and efficient tier, while mid-range custom work averages $365 to $435 and high detail starts at $435 to $490+, turnkey with the land excluded. Read those as averages of many builds: a yardstick for the budget, never the price of your house.
| Finish tier | What it usually means | Average per sq ft | A 2,400 sq ft house |
|---|---|---|---|
| Simple and efficient | Vinyl siding, an asphalt roof, vinyl windows, a compact two-story plan | $315 to $365 | $756,000 to $876,000 |
| Mid-range custom | Fiber cement siding, fiberglass windows, a screened porch | $365 to $435 | $876,000 to $1,044,000 |
| High detail | Wood windows, a metal roof, built-ins and tile throughout | $435 to $490+ | $1,044,000 to $1,176,000+ |
Averages drawn from many turnkey builds, land not included, and never a quote. Well, septic and site work stay on their own lines because Cumberland lots differ so much.
What does a well or septic system cost in Cumberland?
A well or septic system in Cumberland costs extra on top of the house: the septic averages $17,500 to $44,000 plus a $375 town plumbing permit for a non-engineered design, and drilling the well adds $15,500 to $26,500 on average. Public water and sewer, where your street has them, take those lines off the budget.
How much does site work add on a rural Cumberland lot?
Site work on a rural Cumberland lot that is already cleared, with power close by, runs $77,000 to $105,000 on average with the well and septic in it. Wooded RR1 acreage with ledge (shallow bedrock) or a house set far back from the road can carry site work past $165,000.
Where does a Cumberland house land within its tier?
Where a Cumberland house lands within its tier depends on finish choices first, then on the foundation, because a full basement and a slab on frost walls (short walls reaching below the frost line) price differently. The kitchen and bath count comes next, and a garage lifts the total toward the top of the band.
Should Your Cumberland Lot Get Test Pits Before Plans?
Your Cumberland lot should get test pits before plans, and asking for a free estimate sets that in motion: we walk the land, arrange the pits and send a written price once the drawings are done.